Accidents may happen because lifting equipment is not inspected and maintained regularly. All equipment should be thoroughly examined prior to it being put into service and after there has been any major alteration that could affect its operation. UES do it spick and span. We Universal engineering are the supreme supplier of Lifting beams especially spreader beams, Lifting slings and shackles, crane lifting and other hook lifting equipments all over UAE. As the consultant in Middle Eastern countries, we mainly focus on tip toe solutions on your lifting equipment needs.
Lifting equipment may need to be thoroughly examined at intervals laid down in an examination scheme drawn up by a competent person, taking into account the manufacturer’s recommendations and national regulations. All examinations must be undertaken by a competent person who is sufficiently independent and impartial in order that an objective decision can be made.
What needs to be examined depends on the professional judgment of the competent person undertaking the examination. For most common lifting equipment and accessories, there are standard procedures and criteria. Methods include a visual examination and functional checks, measurements of wear, traditional non-destructive testing and load testing.
Where an examination scheme has been drawn up, this should identify and specify the parts to be thoroughly examined, the methods of examination and testing and the intervals for examination (and testing of the different parts, where appropriate).
Reports and defects
Records should be kept of all thorough examinations and inspections for all lifting equipment and lifting accessories. Any defects noticed should be immediately reported to the supervisor for correction. If any defect affects the safe operation of the machine, it should be rectified before the machine is used.
Effective action should be taken to manage risks by ensuring the lifting equipment is not used until the defect is remedied. Such defects must be confirmed in writing in the report, even if it is remedied immediately (e.g. by destruction of a sling). The person making the report must also notify the relevant enforcing authority with a copy of the report. Enforcing authorities may follow up such reports to check that risks are being adequately managed.
At Universal Engineering, no client would be having a void of worry as we cover everything from start to finish. We are here to solve your lifting problems whether it is advice or to design your dream lifting equipment. We prioritize our lifting equipment services like beam lifting equipment , spreader bar lifting equipment, spreader beam, lift beam and four point spreader lift beam (spreader bar for lifting and load spreader). Along with this we do spreader beam calculation and design. Universal provide one tone spreader bar which is in stock and available worldwide via Universal engineering distributors and rental partners for any lifting equipments in a cost effective manner. Feel free to contact us.